Carter Avenue Traffic Calming

Carter Avenue, which connects Annapolis Road and Lanham-Severn Road through a residential neighborhood, has seen a significant increase in traffic. To protect residents and road users, EBA designed traffic-calming curb bump-outs to serve as choke points on Carter Avenue. These bump-outs restrict the width of…

EBA designed, detailed, and produced construction documents for this intersection improvement project, which involved a dedicated bypass lane for an existing intersection that is the main access to a College of Southern Maryland campus. An existing deteriorated roadway embankment was also repaired and reinforced to…

EBA provided supplemental civil engineering design services to resurface and reconstruct approximately one mile of Newkirk Street in Baltimore, Maryland. The existing project area was primarily an open section of undivided, two-lane local roadway. This portion of Newkirk Street is in a heavily industrialized area,…

EBA provided quality control inspection and testing services for the new 538,000-square-foot Social Security Administration campus, located on an 11-acre site near Reisterstown Plaza Metro Station on Wabash Avenue in northwest Baltimore. The transit-oriented facility is designed to house up to 2,300 employees and consists…

EBA provided construction inspection and materials testing services for the pavement rehabilitation of Runway 10-28 and Runway 15R-33L at Baltimore/Washington International Thurgood Marshall Airport. These runways are now in compliance with Congress’ new federal runway safety area improvement mandates. The projects included milling and overlay…

Cox Creek Water Reclamation Facility, a 15-million-gallon-per-day wastewater treatment plant, will be upgraded to meet enhanced nutrient removal (ENR) standards. Construction will be completed in two phases. Phase 1 included demolition of the influent flow meter vault, various distribution channels and boxes, a Mixed Liquor…

As the prime consultant, EBA provided engineering services to the City of Baltimore Wastewater Facilities Division to design a 36-inch force main and associated structures and a 48-inch sanitary sewer with manholes and junction chamber. EBA also provided post-award services during the construction phase. Dundalk…

EBA provided environmental, geotechnical, and civil engineering services for master plan improvements to a correctional complex in Baltimore, Maryland. Work involved demolition of the Baltimore Pre-Release Unit Facility, renovation of the State Use Industries Building, and construction of a new 61,000-square-foot Youth Detention Facility to…

To support this county stream restoration project, EBA provided a detailed topographic map of three stream study areas covering 11 acres. The maps needed to be referenced to the local county datum, which also is part of the Maryland State Plane Coordinate System. EBA located…

EBA provided site investigation, construction document, bid assistance, and construction administration services for deconstruction of the Maryland House of Correction in Jessup, Maryland. The 6-million-square-foot facility was constructed in 1878 and expanded between 1888 and 1993. EBA developed site and building floor plans and provided…